Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

In particular the track gauge is a long way from being the only consideration. Structure gauge and Loading gauge are also crucial. When I first moved here despite this being an important port city a Victorian arch bridge carrying road traffic over the railway meant every single freight train carrying containers from the port to the rest of the country needed to either go on a circuitous route or use special low wagons with reduced capacity, which hold a container below axle height so as to fit under that bridge.

In that case blocking the road and dropping in a new road bridge was affordable given the economic value but generally you put up with what you've got.



True, when it comes to loading gauge one can no longer even about a standard. Most countries have several different loading gauges even for the same track gauge.

In practice I am not convinced the BART is severely impacted by their "weird" gauge (whatever is meant by that, not sure what their loading gauge is, for passenger trains the distance to and height of the platforms would be most relevant).

Stadler KISS series used by Caltrain is built at least in 3 different widths.

Auckland, NZ had (not sure whether still in use) rolling stock from the UK, converted from 1435 mm to 1067 mm track gauge, the loading gauge obviously was close enough.

Finland has engines (Sr3, Dr20) and railcars (Dm12) designed for smaller central European loading gauges. They look a bit tiny compared to other stock, but they are fully usable.




Consider applying for YC's Summer 2026 batch! Applications are open till May 4

Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: